Kursteilnehmer-Bewertung und -Feedback für Construction Scheduling von Columbia University

4.8
Sterne
1,319 Bewertungen
244 Bewertungen

Über den Kurs

Learners will discover the key project scheduling techniques and procedures including; how to create a network diagram, how to define the importance of the critical path in a project network, and defining project activities float. Also covered are the fundamentals of Bar Charts, Precedence Diagrams, Activity on Arrow, PERT, Range Estimating, and linear project operations and the line of balance....

Top-Bewertungen

FL

Dec 27, 2016

The Course is very interesting and helpful from all prospective. I'm the project Owner and it was great experience for better understanding of the scheduling, different techniques and Lean Delivery.

GV

Sep 10, 2020

It was excellent an platform for e-learning and i free courses are tailored in an excellent manner where one can feel that students are not taken for a ride because it covers in a big way.

Filtern nach:

26 - 50 von 240 Bewertungen für Construction Scheduling

von Luis F R M

Apr 26, 2020

It is one of the best courses I have ever had online, the combination of practical with theoretical knowledge and the attention to detail is amazing. I was left with no questions and wanting to learn even more about this subjects.

von Karl B

Jan 30, 2017

Exposure to numerous areas of scheduling software. The presenters were successful at getting across software exposure to the students. Further to scheduling software there were also scheduling analysis software introduction.

von Brian C P H

Sep 02, 2020

Very informative and helpful interms of discussing the basic types of constrcution scheduling, the patterns and how to organize the schedules in more logical ways that will benefit the project to be able to finish on time.

von Agnei M

Mar 12, 2018

It's great, I totally recommend this course for everyone involved in the construction area or interested in being part of it. The lessons, the assignments, everything is just how I expected. Congratulations Dr. Odeh.

von Sharad S

Nov 02, 2017

Very very good course for those in the construction as well as those pondering an entry into the field. Deals with all the concepts really well and gives very clear and concise explanations for all the concepts

von Ayan J

May 05, 2020

I would like to thank to instructors.

This course was amazing, I was inspired from that. I could identify a critical path and do network diagram.

I recommend you if you want to aware of construction scheduling

von Ahmed M S A

Jun 18, 2020

This course was beneficial, I’ve learned a lot about the construction Scheduling, all the material that i had studied at my university I found it here in this course. Thanks Dr. Ibrahim and the other team.

von Felix L

Dec 27, 2016

The Course is very interesting and helpful from all prospective. I'm the project Owner and it was great experience for better understanding of the scheduling, different techniques and Lean Delivery.

von CAMILO A S P

May 05, 2020

The course gives a wide vision of the scheduling discipline from a interdisciplinary view which gives more interest for the students through different point of view and methodologies available.

von George V

Sep 10, 2020

It was excellent an platform for e-learning and i free courses are tailored in an excellent manner where one can feel that students are not taken for a ride because it covers in a big way.

von Vahid T

Dec 24, 2019

This course was beneficial. Each topic was taught in a simple, understandable way, and you may not have any difficulty with the basics. I enjoyed it a lot, and I think this could help you.

von Jatin A

Jun 18, 2020

It was a great course and I would like to thanks coursera for such an opportuntiy and this is a great platform to learn, enhance and upgrade your skills at your comfort..

von Bishoy G G A

Mar 16, 2019

It was a very dynamic course which contained many useful knowledge. I gained many important information that will help me a lot.

Thanks to Coursera and to my Instructors.

von Guillermo R C

Aug 22, 2017

as the previous course, this has covered all my spectatives, thanks coursera and thanks Columbia University for the effort and dedication for the online education

von Rafi M

Jul 23, 2020

Very effective one for a civil engineer. I have known so many important things which i want to apply in my professional field in future. thanks for the course

von Muhammad H

Oct 18, 2019

I have learnt a lot of new Scheduling tools, very happy to complete this course. Thanks a lot Columbia University & respected mentors. Hats off & thumb up.

von Ammar Y

Aug 11, 2018

Amazing course! I've learned a lot from Dr. Odeh and all the stuff are very skilled and have a lot of knowledge. Thank you so much for such a great Course.

von Martyna B

Jun 04, 2017

Extremely well prepared, with plenty of knowledge to be gained, well planned hands-on exercises and well distributed in terms of time and assessments

von Adriano P D V

Jul 23, 2020

al nivel de la excelente introducción, tiene una dificultad mayor, amerita mucho mas esfuerzo que el introductorio. las practicas de muy alto nivel.

von Frantzo P

Sep 08, 2020

Thank you very much for these four courses in the management specialization, it is very helpful for me and my career. thank you for the support.

von greg a

Sep 14, 2017

Good Course, need more guidance with peer projects, and a wrong answer in quiz on week #4 (#2 answer to 2 decimals when it asks for 1 Decimal)

von Terron J D

Jun 03, 2019

Excellent! I was able to expand my current knowledge of construction schedule, the instructors were great in the teachings of this course.

von mark a s

Sep 04, 2017

A very informative and rigorous course. It is highly recommended for engineers as well as architects or who are in construction sectors.

von Arise N S

Apr 13, 2020

This is a professional course for all in construction industry. Very detailed, precise, and great professional speakers. I recommend it!

von Ziaul R S

Aug 05, 2020

Its a tough course you need 100% dedication for timely completion and well thought and explained course, it helps you in career growth.