Determining Critical Path in a Finish to Finish Relationship

Loading...
Lehrplan anzeigen

Kompetenzen, die Sie erwerben

Schedule, Linear Scheduling Method, Program Evaluation And Review Technique (PERT), Critical Path Method

Bewertungen

4.8 (1,459 Bewertungen)
  • 5 stars
    79.71%
  • 4 stars
    17.95%
  • 3 stars
    1.78%
  • 2 stars
    0.34%
  • 1 star
    0.20%
VT
23. Dez. 2019

This course was beneficial. Each topic was taught in a simple, understandable way, and you may not have any difficulty with the basics. I enjoyed it a lot, and I think this could help you.

LF
13. Mai 2020

Sufficient detail (rather than broad concepts) with active, practical learning aspects to it. Easy to navigate and dip in & out as you reference other materials to assist with learning.

Aus der Unterrichtseinheit
Critical Path
Professor Odeh discusses the importance of critical path in this module including what it is and why it is important. Learners will identify a critical path in a project and how to determine a critical path in different relationships.

Unterrichtet von

  • Placeholder

    Ibrahim Odeh, Ph.D., MBA

    Instructor, Department of Civil Engineering and Engineering Mechanics, Columbia University

Durchsuchen Sie unseren Katalog

Melden Sie sich kostenlos an und erhalten Sie individuelle Empfehlungen, Aktualisierungen und Angebote.