Linear Construction Overview and Examples

Loading...
Lehrplan anzeigen

Kompetenzen, die Sie erwerben

Schedule, Linear Scheduling Method, Program Evaluation And Review Technique (PERT), Critical Path Method

Bewertungen

4.8 (1,314 Bewertungen)
  • 5 stars
    79.52%
  • 4 stars
    18.26%
  • 3 stars
    1.67%
  • 2 stars
    0.30%
  • 1 star
    0.22%
GV

Sep 10, 2020

It was excellent an platform for e-learning and i free courses are tailored in an excellent manner where one can feel that students are not taken for a ride because it covers in a big way.

LF

May 14, 2020

Sufficient detail (rather than broad concepts) with active, practical learning aspects to it. Easy to navigate and dip in & out as you reference other materials to assist with learning.

Aus der Unterrichtseinheit
Linear Construction Operations and Line of Balance
Professor Odeh introduces linear construction; projects that have linear, or repetitive, properties. Also covered is the Line of Balance scheduling method which is a way of allocating resources for repetitive processes.

Unterrichtet von

  • Placeholder

    Ibrahim Odeh, Ph.D., MBA

    Instructor, Department of Civil Engineering and Engineering Mechanics, Columbia University

Durchsuchen Sie unseren Katalog

Melden Sie sich kostenlos an und erhalten Sie individuelle Empfehlungen, Aktualisierungen und Angebote.