The Relationship between Calendar Days and Work Days

video-placeholder
Loading...
Lehrplan anzeigen

Kompetenzen, die Sie erwerben

Schedule, Linear Scheduling Method, Program Evaluation And Review Technique (PERT), Critical Path Method

Bewertungen

4.8 (1,573 Bewertungen)

  • 5 stars
    79,59 %
  • 4 stars
    17,92 %
  • 3 stars
    1,97 %
  • 2 stars
    0,31 %
  • 1 star
    0,19 %

VT

23. Dez. 2019

Filled StarFilled StarFilled StarFilled StarFilled Star

This course was beneficial. Each topic was taught in a simple, understandable way, and you may not have any difficulty with the basics. I enjoyed it a lot, and I think this could help you.

LF

13. Mai 2020

Filled StarFilled StarFilled StarFilled StarFilled Star

Sufficient detail (rather than broad concepts) with active, practical learning aspects to it. Easy to navigate and dip in & out as you reference other materials to assist with learning.

Aus der Unterrichtseinheit

Understanding Work Dates and Calendar Dates

In this module, the difference between working dates and calendar dates is explained and how to chart both in a project plan.

Unterrichtet von

  • Placeholder

    Ibrahim Odeh, Ph.D., MBA

    Instructor, Department of Civil Engineering and Engineering Mechanics, Columbia University

Durchsuchen Sie unseren Katalog

Melden Sie sich kostenlos an und erhalten Sie individuelle Empfehlungen, Aktualisierungen und Angebote.